Liebherr – Logistic & Service center

Building of the year

It is an expansion of production facilities through a new logistics center and administrative building. The newly formed building is connected to the existing productions by means of a 350 meter transportation tunnel. An exceptional challenge for the design team was the short deadlines for construction and design.The facilities is designed to the highest international standart (NFPA) in environmental design,energy efficiency and fire protection in order to achieve high standards in insurance.

Investor: Liebherr Hausgeratte Maritsa LTD

Adres: Bulgaria ; Plovdiv;Industrual zone; site 36.313;

General contractor: Lindner Imobilien Management LTD

Site area: 254 764 m2

Total area: 36 233 m2

Status: completed

Project activities:

  • Concept architectural design
  • Architectural tender &working documentation;
  • All project disciplines,coordination in its own team;
  • Monitor  and obtain permition in municipality;
  • Monitoring project execution on site;

The project was awarded the Building of the Year award in the category of industrial buildings for 2016.

Residential park Sofia-Stage 2

Building of the year

The project is a mixture of single-family and multi-family residential buildings. Particular attention is paid to its inclusion in the existing residential complex and as usual to the budget and architectural details.

Investor: Lindner Imobilien Management LTD

Adres: Bulgaria ; Sofia 1766 ; Sofia park;

Site area: 25 808m2

Total area: 13 845 m2

Status: completed

Project activities:

  • Concept architectural design
  • Architectural tender &working documentation;
  • All project disciplines,coordination in its own team;
  • Monitor  and obtain permition in municipality;
  • Monitoring project execution on site;

The project was awarded the Building of the Year award in the category of residential complex for 2017

ABB Rakovski – Electrical equipment factory

Building of the year

New production and office facilities for ABB Bulgaria ,including industrial facilitie with capacity of 600 work-places and office building of 2280m2.

Investor: АBB Rakovski LTD
Adres: Bulgaria; Rakovski; Industrual zone; plot 28;
General contractor: Lindner Imobilien Management LTD
Site area: 27 258 m2
Ground floor area: 15 140.35 m2
Total area: 16196.40 m2
Status: completed
Project activities:

  • Concept architectural design
  • Architectural tender &working documentation;
  • All project disciplines,coordination in its own team;
  • Moniror  and obtajn permition in municipality;
  • Monitoring project execution on site;

The project was awarded the Building of the Year award in the category of industrial buildings for 2013.